Wheatstone Bridge
Four gap system, enabling two additional resistances to be interpolated in the additional gaps, enables greater accuracy of measurement by reducing unwanted resistances to a minimum.Two brass strips are provided to close the gaps when so required. Complete with jockey.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore
Copyright © 2025 Build Bench. All Right Reserved.