Francis Turbine Test Rig

Francis Turbine Test Rig

Dealership

Support Team

Payment & Shipping

Francis Turbine Test Rig

Experiment:
  • To study the operation of a Francis Turbine
  • To determine the Output Power of Francis Turbine
  • To determine the Turbine Efficiency
Utilities Required:
  • Water Supply and Drain
  • Electricity 15 kW, 440V AC, Three Phase
  • Floor Area 1.5 x 0.75 m

    Share Your Enquiry

    Upload Your File